Performance Enhancement Program

Performance Enhancement Program, as  the name implies, is intended for the cooling towers which are not so old but not performing as per the design criteria. Here, SOLUTIONS-d- PERFORMANCE can play a major role in enhancing the performance. The steps followed to implement the program are summarised below:

SCOPE AND THE CONSIDERATION FOR PEP
  • The cooling tower cannot cool down the water to the design cold water temperarture.
  • The tower is working, but the requirement got changed because of higher hot water temperature due to application.
  • The cooling tower asks for very frequent replacement of fill-media or any other component.
  • Replacement required for structural members at very small intervals.
  • Exploring possibility of lowering down fan-motor power consumption.
INITIATION AND STEPS TOWARDS THE EXECUTION OF THE PROGRAM
  • The cooling tower gets inspected by us and discussion with client's maintenance engineers(s) at the site.
  • Close look into the application for the tower and collection of inputs on the application and the cooling tower.
  • Assessment at our end and submission of report, recommendations, Plan of actions, other details and techno-commercial offer. In the case of non-feseability of the expenditure towars the gain out of investment, it gets reported to the client.
  • Discussion with the client for fixing the schedule for the execution of the work, facilities required and supports from client.
EXECUTION METHODOLOGY
  • Execution of work as per the schedule, finalised after discussion with customer's engineers.
  • Testing and trial run on completion of the work — recording of all assessment data in specified tabular form.
  • Fine-tuning, based on the observation and recorded
  • trial run data.
  • Final run and handing over the cooling tower to the client for resuming normal operation.
  • Periodical checking (usually thrice in a year) of the performance by SdP.